Skip to content

Pull requests: volcano-sh/volcano

Author
Filter by author
Label
Filter by label
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Milestones
Filter by milestone
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

fix nil pointer panic when evict size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#3443 opened Apr 26, 2024 by bibibox Loading…
optimizate jobflow controller to reduce invalid reconcile size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#3441 opened Apr 26, 2024 by calvin0327 Loading…
fixed to update podgroup resource size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#3439 opened Apr 25, 2024 by calvin0327 Loading…
export the logs of Volcano components when the e2e test workflow fails lgtm Indicates that a PR is ready to be merged. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#3438 opened Apr 25, 2024 by panoswoo Loading…
add image registry for helm lgtm Indicates that a PR is ready to be merged. ok-to-test Indicates a non-member PR verified by an org member that is safe to test. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#3436 opened Apr 24, 2024 by calvin0327 Loading…
add-action-event size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#3433 opened Apr 23, 2024 by molei20021 Loading…
(WIP)improve: filter out those nodes which are UnschedulableAndUnresolvable when preempting do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#3432 opened Apr 21, 2024 by lowang-bh Loading…
improve: continue allocating if remain tasks is more than job's minMember size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#3430 opened Apr 21, 2024 by lowang-bh Loading…
Add options: worker-threads-for-gc lgtm Indicates that a PR is ready to be merged. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#3425 opened Apr 18, 2024 by WulixuanS Loading…
feat: added question to issue template retest-not-required-docs-only size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#3423 opened Apr 17, 2024 by shruti2522 Loading…
add ut for pkg/controllers/job/plugins size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#3422 opened Apr 17, 2024 by googs1025 Loading…
put back the queue to priority queue after job's resource allocating … size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#3413 opened Apr 15, 2024 by panoswoo Loading…
add ut and refactor for pkg/scheduler/plugins/util/k8s package size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#3412 opened Apr 14, 2024 by googs1025 Loading…
fix: log info or error print lgtm Indicates that a PR is ready to be merged. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#3410 opened Apr 13, 2024 by googs1025 Loading…
improve: add rwlock to fakeBinder and fakeEvictor lgtm Indicates that a PR is ready to be merged. priority/critical-urgent Highest priority. Must be actively worked on as someone's top priority right now. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#3409 opened Apr 13, 2024 by lowang-bh Loading…
docs: fix custom plugin build docs retest-not-required-docs-only size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#3406 opened Apr 12, 2024 by Vacant2333 Loading…
upgrade kind version of e2e and add the document of things to do when volcano adapts to k8s version upgrade size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#3404 opened Apr 12, 2024 by guoqinwill Loading…
fix: exec job validate after init ssn.Tiers. kind/cleanup Categorizes issue or PR as related to cleaning up code, process, or technical debt. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#3395 opened Apr 7, 2024 by lowang-bh Loading…
sort victims in reclaim action lgtm Indicates that a PR is ready to be merged. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#3389 opened Apr 6, 2024 by lowang-bh Loading…
Network Topology Aware Plugin kind/feature Categorizes issue or PR as related to a new feature. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#3388 opened Apr 6, 2024 by lowang-bh Loading…
fix preempt & reclaim shecduler plugin with PreemptPredicateFn lgtm Indicates that a PR is ready to be merged. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#3363 opened Mar 22, 2024 by LivingCcj Loading…
Feature/allow helm config overrides ok-to-test Indicates a non-member PR verified by an org member that is safe to test. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#3354 opened Mar 17, 2024 by lukasboettcher Loading…
Fix device share plugins npe ok-to-test Indicates a non-member PR verified by an org member that is safe to test. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#3351 opened Mar 15, 2024 by coldzerofear Loading…
helm chart: add container security context approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#3350 opened Mar 14, 2024 by viktoriaas Loading…
Bump google.golang.org/protobuf from 1.31.0 to 1.33.0 dependencies Pull requests that update a dependency file needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#3348 opened Mar 13, 2024 by dependabot bot Loading…
ProTip! Exclude everything labeled bug with -label:bug.