[IMP] Manufacturing: Subcontracting overview
X-original-commit: 68dd997
- Loading branch information
1 parent
08f369e
commit 7025825
Showing
14 changed files
with
79 additions
and
188 deletions.
There are no files selected for viewing
267 changes: 79 additions & 188 deletions
267
content/applications/inventory_and_mrp/manufacturing/workflows/subcontracting.rst
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -1,214 +1,105 @@ | ||
============================== | ||
Subcontract your Manufacturing | ||
============================== | ||
======================= | ||
Subcontracting overview | ||
======================= | ||
|
||
Outsourcing a portion or all of your company’s manufacturing needs | ||
is not easy. To make it work correctly, you have to: | ||
.. |BoM| replace:: :abbr:`BoM (Bill of Materials)` | ||
|
||
- Manage the inventory of raw materials at your subcontractor | ||
- Ship raw material to your subcontractors, at the right time | ||
- Control incoming goods quality | ||
- Control subcontractors bills | ||
In manufacturing, *subcontracting* is the process of a company engaging a third-party manufacturer, | ||
or subcontractor, to manufacture products that are then sold by the contracting company. | ||
|
||
Here is an example of subcontracting the manufacturing of “C”, which is | ||
produced out of raw materials “A” and “B”. | ||
Subcontracting provides a variety of benefits for both the contracting company and the | ||
subcontractor. | ||
|
||
.. image:: subcontracting/subcontracting_01.png | ||
:align: center | ||
:alt: | ||
For the contracting company, subcontracting allows them to sell a wide variety of manufactured | ||
products, without having to worry about investing in and maintaining the equipment and labor | ||
required to handle the manufacturing themselves. | ||
|
||
With its MRP subcontracting feature, Odoo helps you handle this flow easily. | ||
This helps contracting companies stay flexible throughout economic cycles, as they can easily | ||
increase or decrease their engagements with subcontractors, as necessitated by the current moment. | ||
It also means they are able to focus on tasks they excel at, while delegating more specialized work | ||
to subcontractors. | ||
|
||
Configuration | ||
============= | ||
|
||
To use the subcontracting feature, go to :menuselection:`Manufacturing | ||
--> Configuration --> Settings` and tick the box *Subcontracting*. | ||
|
||
.. image:: subcontracting/sbc_1.png | ||
:align: center | ||
:alt: | ||
|
||
To define if a product must be subcontracted, use a *Bill of Materials | ||
(BoM)* of type *Subcontracting*. | ||
|
||
To create a new *BoM*, go to :menuselection:`Manufacturing --> Products --> | ||
Bill of Materials` and hit create. Then, list the components | ||
your subcontractor needs to manufacture the product. For costing | ||
purposes, you might want to register all the components, even the ones | ||
that are sourced directly from the subcontractor. | ||
|
||
Once you have set the *BoM Type* to *Subcontracting*, specify one or | ||
several subcontractors. | ||
|
||
.. image:: subcontracting/sbc_2.png | ||
:align: center | ||
:alt: | ||
|
||
Basic Subcontracting Flow | ||
========================= | ||
|
||
To let your subcontractor know how many products you need, create and | ||
send them purchase orders (PO). To do so, go to the *Purchase* app and | ||
create a new purchase order. Be sure to send the PO to a vendor that is | ||
defined as a subcontractor on the *BoM* of these products. | ||
|
||
.. image:: subcontracting/subcontracting_04.png | ||
:align: center | ||
:alt: | ||
|
||
Once the *PO* is validated (1), a pending receipt is created. When the | ||
products are received, validate the receipt (2), with the actual | ||
quantity received. As a result, Odoo does the following things for you: | ||
|
||
- Consumes the respective components at the subcontractor’s location, based on the *BoM* and your input (3); | ||
|
||
- Produces the finished goods at the subcontractor’s location (4); | ||
|
||
- Moves products from that subcontractor’s location to YourCompany | ||
via the validated receipt (5). | ||
|
||
|
||
.. note:: | ||
The *PO* is optional. If you create a receipt manually, with the right | ||
subcontractor, Odoo still performs all the moves. This can be useful if | ||
the subcontractor does not bill a fixed price per item, but rather the time | ||
and materials used. | ||
|
||
Inventory Valuation | ||
=================== | ||
|
||
The cost of the manufactured product “C” is defined as: | ||
|
||
**C = A + B + s** | ||
On the other side of the relationship, subcontracting allows subcontractors to specialize in more | ||
niche areas of production, which might not be as profitable outside the bounds of a subcontracting | ||
engagement. In certain arrangements, it also provides them with the flexibility to choose which | ||
projects they accept or decline, and how many they work on at any given time. | ||
|
||
With: | ||
In Odoo, companies can configure their subcontracting workflows based on a variety of different | ||
factors, including how components are sourced, and what happens to finished products once they are | ||
manufactured. | ||
|
||
- **A**: Cost of raw materials coming from YourCompany; | ||
|
||
- **B**: Cost of raw materials sourced directly from the | ||
subcontractor; | ||
|
||
- **s**: Cost of the subcontracted service. | ||
|
||
Sending raw materials to your subcontractors (**A**) does not impact | ||
the inventory valuation, as the components are still valued as part of | ||
your stock. This is managed by making the *Subcontracting Location* an | ||
*Internal Location*. | ||
|
||
Then, the vendor price set on the product C form has to be what has to | ||
be paid to the subcontractor for his parts and service time: **B + | ||
s**. The product cost has to be: **A + B + s**, how much the | ||
product is valued in the accounting. | ||
|
||
Finally, the subcontractor bill then matches the purchase order, with | ||
the proposed price coming from the finished products C. | ||
|
||
.. note:: | ||
If managing the replenishment of raw materials **B** at your | ||
subcontractor’s location is not needed, simply include the cost of | ||
**B** in the subcontractor’s price **s** and remove the products | ||
*B* from the *BoM*. | ||
|
||
Traceability | ||
============ | ||
|
||
In case the received products from the subcontractor contain tracked | ||
components, their serial or lot numbers need to be specified during the | ||
receipt. | ||
|
||
In that case, on the receipt of the subcontracted product, a *Record Components* | ||
button appears. Click on it to open a dialog box and record the serial/lot numbers of | ||
the components. If the finished product is also tracked, its serial/lot number can | ||
be registered here too. | ||
|
||
.. image:: subcontracting/sbc_3.png | ||
:align: center | ||
:alt: | ||
|
||
For audit purposes, it is possible to check the lot numbers recorded on | ||
a receipt by using the icon on the right of the finished products: | ||
|
||
.. image:: subcontracting/sbc_4.png | ||
:align: center | ||
:alt: | ||
|
||
Also note that in case flexible consumption has been selected on the subcontracted | ||
BOM for a non-tracked product, the record components option will also appear | ||
optionally on each move line, if you want to register more or less component consumption | ||
at your subcontracting location, when receiving your final product. | ||
|
||
.. image:: subcontracting/sbc_5.png | ||
:align: center | ||
:alt: | ||
|
||
As you can see, the reception of both of these non-tracked products can either be executed | ||
by selecting the 'Set Quantities' Option or via the move line hamburger menus. | ||
|
||
Automate Replenishment of Subcontractors | ||
======================================== | ||
|
||
There are two ways to automate the supply of raw materials to your | ||
subcontractors when purchasing the final product. The chosen method | ||
depends on whether or not you want the materials to transit through your | ||
warehouse. Both of these methods are described as pull style mechanisms as | ||
their trigger is the inital PO to the subcontractor, which creates a need | ||
at the subcontracting location, for raw material. | ||
|
||
If you are supplying your subcontractor with raw material from your own warehouse, | ||
you must activate the 'Resupply Subcontractor on Order' route as shown | ||
below. If this is a component that you buy from a vendor, the buy route | ||
should also be activated. | ||
Configuration | ||
============= | ||
|
||
To enable subcontracting in Odoo, navigate to :menuselection:`Manufacturing app --> Configuration | ||
--> Settings`, and tick the checkbox next to the :guilabel:`Subcontracting` setting, under the | ||
:guilabel:`Operations` heading. Then, click :guilabel:`Save`. | ||
|
||
.. image:: subcontracting/sbc_6.png | ||
:align: center | ||
:alt: | ||
.. image:: subcontracting/subcontracting-setting.png | ||
:align: center | ||
:alt: The Subcontracting setting in the manufacturing app. | ||
|
||
With subcontracting enabled, a few different features become available in Odoo: | ||
|
||
Now, if you want your vendor to resupply your subcontractor directly, you | ||
must choose the 'Dropship Subcontractor on Order' option instead. In order | ||
for this option to be active on the product form, you must first activate the | ||
dropship option from :menuselection:`Purchase --> Configuration --> Settings --> | ||
Dropshipping`. | ||
Once the PO to the subcontractor is validated, this route will create a dropship | ||
RFQ from your vendor to that subcontractor. You then just need to review and validate it. | ||
- On bills of materials (BoMs), the *BoM Type* field now includes a *Subcontracting* option. | ||
Enabling the *Subcontracting* |BoM| type designates the |BoM|'s product as a subcontracted | ||
product, which means Odoo knows that it is produced by a subcontractor, and not by the company | ||
that owns the Odoo database. | ||
- Two subcontracting routes become available in the *Inventory* app, and can be assigned to specific | ||
products, on the *Inventory* tab of their product pages: | ||
|
||
- *Resupply Subcontractor on Order* | ||
- *Dropship Subcontractor on Order* | ||
|
||
.. image:: subcontracting/sbc_7.png | ||
:align: center | ||
:alt: | ||
Subcontracting workflows | ||
======================== | ||
|
||
Note that the buy route is not selected in this case, as the dropship route is | ||
a buy route already. | ||
In Odoo, there are three subcontracting workflows, the main difference between them being *how* the | ||
subcontractor obtains the necessary components: | ||
|
||
Finally, if you want to track the stock of these raw materials at your subcontracting | ||
location(s), then you must activate *Multi-locations* in :menuselection:`Inventory --> | ||
Configuration --> Settings --> Storage locations`. | ||
- In the *basic* subcontracting workflow, the subcontractor is fully responsible for obtaining the | ||
components. This workflow is outlined in the :doc:`subcontracting_basic` documentation. | ||
- In the *Resupply Subcontractor on Order* workflow, the contracting company sends the components | ||
from their warehouse to the subcontractor. This workflow is outlined in the | ||
:doc:`subcontracting_resupply` documentation. | ||
- In the *Dropship Subcontractor on Order* workflow, the contracting company purchases the | ||
components from a vendor, and has them delivered directly to the subcontractor. This workflow is | ||
outlined in the :doc:`subcontracting_dropship` documentation. | ||
|
||
From the location form, you are then able to access the Current Stock. | ||
In addition to how a subcontractor obtains components, it is also necessary to consider why a | ||
product is being subcontracted, as well as what happens to products once they are manufactured by | ||
the subcontractor. | ||
|
||
.. image:: subcontracting/sbc_8.png | ||
:align: center | ||
:alt: | ||
In terms of why a product is being subcontracted, the two main reasons are to fulfill a customer | ||
order, or to replenish the quantity of stock on-hand. | ||
|
||
In terms of what happens to products once they are manufactured, they can either be shipped to the | ||
contracting company, or dropshipped directly to an end customer. | ||
|
||
Each of the three subcontracting workflows described above can be configured to facilitate any of | ||
these possibilities, and the methods for doing so are outlined in their respective documentation. | ||
|
||
Manual Replenishment | ||
-------------------- | ||
Subcontracted product valuation | ||
=============================== | ||
|
||
You can also choose to replenish your subcontractors manually. | ||
The valuation of a subcontracted product depends upon a few different variables: | ||
|
||
If you want to send components to your subcontractor at your own convenience, | ||
select the 'Resupply Subcontractor' Operation Type from the *Inventory* Module, | ||
and create a picking, specifying to which subcontractor you are delivering to. | ||
- The cost of the required components, if provided by the contracting company; from here on referred | ||
to as `C`. | ||
- The price paid to the subcontractor for the service of manufacturing the subcontracted product; | ||
from here on referred to as `M`. | ||
- The cost of shipping components to the subcontractor, and having them shipped back to the | ||
contracting company; from here on referred to as `S`. | ||
- The cost of dropshipping, if the components are shipped by the subcontractor to the end customer; | ||
from here on referred to as `D`. | ||
- Any other associated costs, like import taxes, etc.; from here on referred to as `x`. | ||
|
||
.. image:: subcontracting/sbc_9.png | ||
:align: center | ||
:alt: | ||
Therefore, the total valuation of a subcontracted product (`P`) can be represented by the following | ||
equation: | ||
|
||
Alternatively, you can also manually ask your vendor to resupply your subcontractor | ||
by creating a dropship type PO, with your subcontractor set as the delivery address. | ||
.. math:: | ||
P = C + M + S + D + x | ||
.. image:: subcontracting/sbc_10.png | ||
:align: center | ||
It is important to note that not every subcontracted product valuation will include all of these | ||
variables. For example, if the product is not dropshipped to the end customer, then there is no need | ||
to factor in the cost of dropshipping. |
Binary file removed
BIN
-59.6 KB
...applications/inventory_and_mrp/manufacturing/workflows/subcontracting/sbc_1.png
Binary file not shown.
Binary file removed
BIN
-52.6 KB
...pplications/inventory_and_mrp/manufacturing/workflows/subcontracting/sbc_10.png
Binary file not shown.
Binary file removed
BIN
-43.8 KB
...applications/inventory_and_mrp/manufacturing/workflows/subcontracting/sbc_2.png
Binary file not shown.
Binary file removed
BIN
-20.9 KB
...applications/inventory_and_mrp/manufacturing/workflows/subcontracting/sbc_3.png
Binary file not shown.
Binary file removed
BIN
-16 KB
...applications/inventory_and_mrp/manufacturing/workflows/subcontracting/sbc_4.png
Binary file not shown.
Binary file removed
BIN
-40.2 KB
...applications/inventory_and_mrp/manufacturing/workflows/subcontracting/sbc_5.png
Binary file not shown.
Binary file removed
BIN
-25.8 KB
...applications/inventory_and_mrp/manufacturing/workflows/subcontracting/sbc_6.png
Binary file not shown.
Binary file removed
BIN
-25.6 KB
...applications/inventory_and_mrp/manufacturing/workflows/subcontracting/sbc_7.png
Binary file not shown.
Binary file removed
BIN
-39.7 KB
...applications/inventory_and_mrp/manufacturing/workflows/subcontracting/sbc_8.png
Binary file not shown.
Binary file removed
BIN
-6 KB
...applications/inventory_and_mrp/manufacturing/workflows/subcontracting/sbc_9.png
Binary file not shown.
Binary file added
BIN
+1.89 KB
...ntory_and_mrp/manufacturing/workflows/subcontracting/subcontracting-setting.png
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.
Binary file removed
BIN
-8.76 KB
.../inventory_and_mrp/manufacturing/workflows/subcontracting/subcontracting_01.png
Binary file not shown.
Binary file removed
BIN
-10.1 KB
.../inventory_and_mrp/manufacturing/workflows/subcontracting/subcontracting_04.png
Binary file not shown.