Skip to content

Update ddos_detector.py #28

Update ddos_detector.py

Update ddos_detector.py #28

Triggered via push June 19, 2023 01:50
Status Failure
Total duration 36s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.9)
Process completed with exit code 30.
build (3.8)
The job was canceled because "_3_9" failed.
build (3.8)
The operation was canceled.
build (3.10)
The job was canceled because "_3_9" failed.
build (3.10)
The operation was canceled.