Skip to content

Pull requests: cert-manager/csi-driver-spiffe

Author
Filter by author
Label
Filter by label
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Milestones
Filter by milestone
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

Bump the all group across 1 directory with 8 updates dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. dependencies Pull requests that update a dependency file go Pull requests that update Go code needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#147 opened May 15, 2024 by dependabot bot Loading…
[CI] Merge self-upgrade-main into main dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#145 opened May 11, 2024 by github-actions bot Loading…
Allow runtime configuration of issuers dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. size/XL Denotes a PR that changes 500-999 lines, ignoring generated files.
#141 opened May 9, 2024 by SgtCoDFish Loading…
Remove csi-driver-spiffe approver dco-signoff: no Indicates that at least one commit in this pull request is missing the DCO sign-off message. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#107 opened Mar 25, 2024 by inteon Draft
ProTip! Type g i on any issue or pull request to go back to the issue listing page.