Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Backport #61869 to 24.3: Fix flaky tests 2 (stateless, integration) #62030

Merged
merged 1 commit into from Mar 28, 2024

Conversation

robot-ch-test-poll2
Copy link
Contributor

Original pull-request #61869
Cherry-pick pull-request #62029

This pull-request is a last step of an automated backporting.
Treat it as a standard pull-request: look at the checks and resolve conflicts.
Merge it only if you intend to backport changes to the target branch, otherwise just close it.

@robot-ch-test-poll2 robot-ch-test-poll2 added the pr-backport Changes, backported to release branch. Do not use manually - automated use only! label Mar 28, 2024
@robot-ch-test-poll3
Copy link
Contributor

This is an automated comment for commit 969cc4e with description of existing statuses. It's updated for the latest CI running

✅ Click here to open a full report in a separate page

Successful checks
Check nameDescriptionStatus
ClickBenchRuns [ClickBench](https://github.com/ClickHouse/ClickBench/) with instant-attach table✅ success
ClickHouse build checkBuilds ClickHouse in various configurations for use in further steps. You have to fix the builds that fail. Build logs often has enough information to fix the error, but you might have to reproduce the failure locally. The cmake options can be found in the build log, grepping for cmake. Use these options and follow the general build process✅ success
Compatibility checkChecks that clickhouse binary runs on distributions with old libc versions. If it fails, ask a maintainer for help✅ success
Docker keeper imageThe check to build and optionally push the mentioned image to docker hub✅ success
Docker server imageThe check to build and optionally push the mentioned image to docker hub✅ success
Docs checkBuilds and tests the documentation✅ success
Install packagesChecks that the built packages are installable in a clear environment✅ success
Performance ComparisonMeasure changes in query performance. The performance test report is described in detail here. In square brackets are the optional part/total tests✅ success
Stateful testsRuns stateful functional tests for ClickHouse binaries built in various configurations -- release, debug, with sanitizers, etc✅ success
Unit testsRuns the unit tests for different release types✅ success
Upgrade checkRuns stress tests on server version from last release and then tries to upgrade it to the version from the PR. It checks if the new server can successfully startup without any errors, crashes or sanitizer asserts✅ success

@fm4v fm4v merged commit 923b806 into 24.3 Mar 28, 2024
53 of 59 checks passed
@fm4v fm4v deleted the backport/24.3/61869 branch March 28, 2024 10:08
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
pr-backport Changes, backported to release branch. Do not use manually - automated use only!
Projects
None yet
Development

Successfully merging this pull request may close these issues.

None yet

5 participants