Skip to content

Pull requests: kubestellar/kubestellar

Author
Filter by author
Label
Filter by label
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Milestones
Filter by milestone
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

✨ Prep for release 0.23.0-rc2 dco-signoff: yes Indicates the PR's author has signed the DCO. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#2199 opened Jun 12, 2024 by MikeSpreitzer Loading…
✨ Track ks/OTP release 0.1.10 dco-signoff: yes Indicates the PR's author has signed the DCO. lgtm Indicates that a PR is ready to be merged. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#2198 opened Jun 12, 2024 by MikeSpreitzer Loading…
✨ sharded manifestwork dco-signoff: yes Indicates the PR's author has signed the DCO. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#2195 opened Jun 11, 2024 by effi-ofer Loading…
📖 Update packaging doc dco-signoff: yes Indicates the PR's author has signed the DCO. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#2194 opened Jun 10, 2024 by MikeSpreitzer Loading…
✨ Add metrics to transport controller dco-signoff: yes Indicates the PR's author has signed the DCO. size/XL Denotes a PR that changes 500-999 lines, ignoring generated files.
#2192 opened Jun 7, 2024 by MikeSpreitzer Loading…
📖 Basic website redesign applied to current main dco-signoff: yes Indicates the PR's author has signed the DCO. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#2183 opened May 30, 2024 by KPRoche Loading…
✨ CombinedStatus Calculation (part 2) dco-signoff: yes Indicates the PR's author has signed the DCO. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#2174 opened May 28, 2024 by vMaroon Draft
✨ Script to get CP contexts dco-signoff: yes Indicates the PR's author has signed the DCO. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#2172 opened May 24, 2024 by francostellari Loading…
✨ Make the status controller handle the deletion of workstatuses dco-signoff: yes Indicates the PR's author has signed the DCO. priority/medium Must be staffed and worked on either currently, or very soon, ideally in time for the next release. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#2076 opened Apr 23, 2024 by waltforme Loading…
✨ Design ideas for API for combining reported state dco-signoff: yes Indicates the PR's author has signed the DCO. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. do-not-merge DEPRECATED. Indicates that a PR should not merge. Label can only be manually applied/removed. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#2055 opened Apr 15, 2024 by MikeSpreitzer Loading…
✨ add performance test dco-signoff: yes Indicates the PR's author has signed the DCO. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#2011 opened Apr 3, 2024 by effi-ofer Loading…
ProTip! Filter pull requests by the default branch with base:main.