Skip to content

Determine where to place new charging stations on a map based on locations of existing charging stations and points of interest.

License

Notifications You must be signed in to change notification settings

dwave-examples/ev-charger-placement

Repository files navigation

Open in GitHub Codespaces Linux/Mac/Windows build status

Placement of Charging Stations

Determining optimal locations to build new electric vehicle charging stations is a complex optimization problem. Many factors should be taken into consideration, like existing charger locations, points of interest (POIs), quantity to build, etc. In this example, we take a look at how we might formulate this optimization problem and solve it using D-Wave's binary quadratic model (BQM) hybrid solver.

Usage

To run the demo, type the command:

python demo.py

The program will construct a 14x15 grid representation of a city, and randomly place 3 POIs and 4 current charging station locations. Using the BQM hybrid solver, locations for 2 new charging stations will be selected.

After the new charging station locations have been selected, an image is created. This image shows the current map with existing charging locations shown in red and POIs denoted by P (left figure), as well as a future map with the future charging station locations colored in blue (right figure). This image is saved as map.png, as shown in the image below.

Example output

Finally, the new charging locations within the grid are printed on the command line for the user, as well as some information on distances in the new map.

Customizing the scenario

Options are also provided for the user to customize several components of the randomly generated scenario.

  • -x: set the grid horizontal dimension. Default: 15.
  • -y: set the grid vertical dimension. Default: 15.
  • -p: set the number of POIs on the grid. Default: 3.
  • -c: set the number of existing charging stations on the grid. Default: 4.
  • -n: set the number of new charging stations to be placed. Default: 2.
  • -s: set a random seed so that specific senarios can be repeated.

Any combination of these options may be used. For example:

python demo.py -x 10 -y 10 -c 2

builds a random scenario on a 10x10 grid with 3 POIs, 2 existing chargers, and 2 new locations to be identified.

Problem Formulation

There are many different variations of the electric vehicle charger placement problem that might be considered. For this demo, we examine the case in which a small region is under consideration, and all locations in our area of consideration are within walking distance. In this situation, we want to place new charging locations that are convenient to all POIs. For example, if the POIs are shops on a main street it is most convenient to park once in a central location. We will satisfy this need by considering the average distance from a potential new charging location all POIs [1]. Additionally, we want to place new chargers away from existing and other new charging locations so as to minimize overlap and maximize coverage of the region.

This problem can be considered as a set of 4 independent constraints (or objectives) with binary variables that represent each potential new charging station location.

Minimize distance to POIs

For each potential new charging station location, we compute the average distance to all POIs on the map. Using this value as a linear bias on each binary variable, our program will prefer locations that are (on average) close to the POIs. Note that this constraint could be replaced by an alternative one depending on the real world scenario for this problem.

Maximize distance to existing charging stations

For each potential new charging station location, we compute the average distance to all existing charging locations on the map. Using the negative of this value as a linear bias on each binary variable, our program will prefer locations that are (on average) far from existing chargers.

Maximize distance to other new charging stations

For the pair of new charging station locations, we would like to maximize the distance between them. To do this, we consider all possible pairs of locations and compute the distance between them. Using the negative of this value as a quadratic bias on the product of the corresponding binary variables, our program will prefer locations that are far apart.

Build exactly two new charging stations

To select exactly two new charging stations, we use dimod.generators.combinations. This function in Ocean's dimod package sets exactly num_new_cs of our binary variables (bqm.variables) to have a value of 1, and applies a strength to this constraint (gamma4). See below for more information on the tunable strength parameter.

Parameter tuning

Each of these constraints is built into our BQM object with a coefficient (names all start with gamma). This term gamma is known as a Lagrange parameter and can be used to weight the constraints against each other to accurately reflect the requirements of the problem. You may wish to adjust this parameter depending on your problem requirements and size. The value set here in this program was chosen to empirically work well as a starting point for problems of a wide-variety of sizes. For more information on setting this parameter, see D-Wave's Problem Formulation Guide.

Faster BQM Construction

An alternative demo file, demo_numpy.py, shows how the BQM for this problem can be constructed using NumPy arrays and vectors. Utilizing NumPy and matrix operations allows for a much faster construction of the BQM than building it with for-loops. As problem instances become larger and larger, it becomes more and more important to efficiently build the BQM to save time in the initialization and setup of the model. The chart below demonstrates the savings in classical compute time when setting up the BQM for this problem using for-loops versus using efficient NumPy operations in the Leap IDE.

Classical comparison

References

[1] Pagany, Raphaela, Anna Marquardt, and Roland Zink. "Electric Charging Demand Location Model—A User-and Destination-Based Locating Approach for Electric Vehicle Charging Stations." Sustainability 11.8 (2019): 2301. https://doi.org/10.3390/su11082301

About

Determine where to place new charging stations on a map based on locations of existing charging stations and points of interest.

Topics

Resources

License

Stars

Watchers

Forks

Releases

No releases published

Packages

No packages published

Languages