Bump thor requirement #260
Annotations
3 errors and 4 warnings
test (3.11)
Process completed with exit code 2.
|
test (3.9)
The job was canceled because "_3_11" failed.
|
test (3.9)
The operation was canceled.
|
test (3.9)
Failed to download action 'https://api.github.com/repos/actions/checkout/tarball/0ad4b8fadaa221de15dcec353f45205ec38ea70b'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
test (3.9)
Back off 25.412 seconds before retry.
|
test (3.9)
Failed to download action 'https://api.github.com/repos/actions/checkout/tarball/0ad4b8fadaa221de15dcec353f45205ec38ea70b'. Error: Connection reset by peer (api.github.com:443)
|
test (3.9)
Back off 15.406 seconds before retry.
|