You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
gino-m
changed the title
[Data collection] Done button not showing on conditional task
[Data collection] Done button not showing when conditional task is last task
Mar 18, 2024
gino-m
changed the title
[Data collection] Done button not showing when conditional task is last task
[Data collection] Done button not showing when conditional task is final task
Mar 18, 2024
Needed to modify your survey since a photo task was added at the end. To repro, the second to last task needs to be non-conditional, and the last task hidden due to unfulfilling the condition. In this situation, the Done button does not get rendered since it's not the actual last task in the list even though it's the last task in the sequence. I think the problem is that the "Done" button is triggered when the current view is the final view in the list of absolute views, but is not calculated dynamically.
It gets really weird when the task that triggers subsequent conditions is the last task in the sequence, then it has no way of knowing that it is or isn't the last task!
I didn't end up fixing this problem the first time since it was a bit out of my understanding, but I'm happy to tackle it after I get some P0s or P1s out of the way.
Conditional task is the final task:
Non-conditional task is the final task (the previous one is hidden):
The button label should say "Done", instead it shows "Next".
Survey (with ACL removed)..
@sufyanAbbasi FYI
The text was updated successfully, but these errors were encountered: