You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Email have been sent out notifying that support for Postgres 11 will reach EoL November 9th, 2025, however, the documentation states in many places that support will be continued till Nov 9 2025.
@PesalaPavan The issues was the discrepancy was that the email that Azure sent out said 2024 and the docs said 2025. It was unclear which was correct and authoritative. A correction email has been sent by the Azure team to all using Postgres 11 Flexible Server that 2025 is the timeline. This can be closed now
Email have been sent out notifying that support for Postgres 11 will reach EoL November 9th, 2025, however, the documentation states in many places that support will be continued till Nov 9 2025.
Documentation:
https://learn.microsoft.com/en-us/azure/postgresql/flexible-server/concepts-version-policy#flexible-server-support
https://learn.microsoft.com/en-us/azure/postgresql/flexible-server/concepts-version-policy#major-version-retirement-policy
Document Details
⚠ Do not edit this section. It is required for learn.microsoft.com ➟ GitHub issue linking.
The text was updated successfully, but these errors were encountered: