Deploying

Follow the guidance below when deploying major changes that affect the generation or validation of PDFs. You may also need to do some visual testing, depending on the change.

Why we need this guidance

The real-world variability of PDFs isn't represented in the test suite*. A PDF can also appear to be visually OK but cause problems when combined with other PDFs in a print run:

  • We could send our print provider valid PDFs which the new version of the code has corrupted so they won't print or need to be printed individually / manually.

  • We could start rejecting lots of PDFs. This isn't a disaster: a user can always re-upload a letter we've incorrectly rejected, after we fix the issue / rollback.

  • We could start accepting too many PDFs. This may only become apparent when our print provider or potentially recipients (if the letter was gibberish) complain.

*In a typical hour we see PDFs produced by e.g. PDFsharp, LibreOffice, PDFKit, pdf-lib, Microsoft® Word, Microsoft: Print To PDF, Adobe Acrobat. There are also many others.

Suggested deployment steps

Test deployment

Deploy the branch manually to Production.

  • Suggested deployment window: 1 hour, no later than 4PM.
  • Don't do it on a Friday.
  • Send a courtesy email to our print provider.

This means any problems caused by the test deployment are contained in a single print run. Traffic isn't significantly lower at any time during working hours, so pick an hour that suits you.

During the test deployment, monitor:

  • Grafana for 4xx / 5xx (for the notify-template-preview app).
  • Statuses in the DB (for thenotify-template-preview-celery app).

Query to check for letter statuses:

select date_trunc('hour', created_at) as created_after, notification_status, count(*) from notifications
where notification_type='letter'
and created_at > '2021-11-25 12:00'
and created_at < '2021-11-25 17:00'
and key_type != 'test'
group by 1,2
order by 2,1;

Before deploying again, wait until you have delivery receipts for all letters created during the test deploy. Even if a few are still sending, it's worth waiting to find out if they are symptoms of a problem.

Optional step: validation analysis

You can also look at the distribution of validation failures before / during the test deploy window. This requires a bit of hacky data crunching with CloudWatch.

# set the time range for the query to e.g. 1 week

fields @timestamp, @message
| filter levelname == "ERROR" or levelname == "WARNING"
| parse message /([^\.:]+:)?(?<error>[^\.,0-9]+)/
| stats count(*) by error, bin(1d) as day
| sort error, day desc

The parse regex tries to strip out IDs and fluff so the results easier to group and visually scan. Compare the results line by line, for each error / day, to check for new errors or significant increases.

Optional step: coverage analysis

It's worth checking which types of PDF were covered by the test deploy. This can inform whether a longer test deploy would be worthwhile. You can use CloudFront to extract this information:

fields @timestamp, @message
| filter message like "Processing letter"
| parse message 'Processing letter "*" with creator "*" and producer "*"' as letter, creator, producer
| stats count(*) as count by producer
| sort count desc

Set the time range to the trial deployment window and repeat for a longer period e.g. a week. A visual comparison may suffice, or you can do a spreadsheet like this one to thoroughly check coverage.

Repeat the analysis for "creator", as both of these properties could have an impact.

Normally we'd expect over 90% coverage.